Multifamily Tampa, FL
The MAV
Two buildings, 20 and 5 stories
CEOS Group scope
We installed ductwork, copper lines, corridors, indoor units and rooftop condensers in two buildings, 20 and 5 stories tall.
Project description
Complete HVAC system installation in two buildings (20 and 5 stories). We installed ducts, copper lines, corridors, indoor units, and condensers on the roof, leaving the entire system fully operational.
Project gallery