The MAV
Multifamily Tampa, FL

The MAV

Two buildings, 20 and 5 stories

All projects

CEOS Group scope

We installed ductwork, copper lines, corridors, indoor units and rooftop condensers in two buildings, 20 and 5 stories tall.

Project description

Complete HVAC system installation in two buildings (20 and 5 stories). We installed ducts, copper lines, corridors, indoor units, and condensers on the roof, leaving the entire system fully operational.

Project gallery

Jobsite photo 1: The MAV
Jobsite photo 2: The MAV
Jobsite photo 3: The MAV