Commercial Winter Haven, FL
Legoland, new attraction
CEOS Group scope
Ducts and copper lines from underground connections to the startup area, with Energy Air.
Project description
Participation in the installation phase of the new roller coaster at the park. Responsible for the setup and routing of ducts and copper lines from the underground utilities up to the startup area, in collaboration with the Energy Air team. The work included coordinating with multiple trades to ensure proper alignment and integration of the mechanical and electrical systems, following safety and quality standards throughout the project.
Project gallery