This new project consists of 2 buildings, one of 20 floors and one of 9 floors. In total there are 444 air conditioning units where, for the moment only the copper part is being done, using VRF air conditioning systems, which means variable refrigerant flow where a common external unit is connected to multiple internal units through insulated copper piping. In addition to this process the installation of condensers on the roof and units per room will be carried out.

Description

This new project consists of 2 buildings, one of 20 floors and one of 9 floors. In total there are 444 air conditioning units where, for the moment only the copper part is being done, using VRF air conditioning systems, which means variable refrigerant flow where a common external unit is connected to multiple internal units through insulated copper piping. In addition to this process the installation of condensers on the roof and units per room will be carried out.

Execution time

Ongoing

Location

St Peat

All Proyects

Translate »